Formwork and Safety Netting Installation
Construction is ongoing for a new cast-in-place concrete building in Brooklyn, NY. Becker Engineering, PC provided construction engineering designs for the proposed construction (concrete column and wall formwork, slab reshoring, vertical netting/guardrails, and horizontal netting). Slab formwork drawings were provided by the shoring system manufacturer for this project.